Project
Financial scope:53,000,000 NIS
Execution period:to date
Work commissioned:Omer Engineering LTD
Mission: Electrical, Air Conditioning and Sanitation work in a 40 story-high office building situated on 62,400 square meters, a 4-floor parking lot of 49,000 square meters and a shopping mall situated on 2,523 square meters.
Electricity: Execution of electricity, MG facilities including transformers, MG boards, MN boards with double-floor sub-boards, generator, control and , power facilities
Air Conditioning: Execution of ventilation system
Plumbing: Sanitation, sprinklers, and shutdown systems
גלריה של הפרויקט