Skip to main content
Font Size:
Site Colors:
Accesskey
S - Skip navigation
1 - Home page
4 - Search

Alon Towers, Tel Aviv, Israel

Project

Financial scope:53,000,000 NIS
Execution period:to date
Work commissioned:Omer Engineering LTD

Mission: Electrical, Air Conditioning and Sanitation work in a 40-story high office building of ​​62,400 square meters, a 4- floor parking lot covering ​​49,000 square meters, and 2,523 square meter shopping center.

Electricity: High voltage transformers and panels, low voltage panels with floor sub-panels, generator, control, building control, power facilities

Air conditioning: ventilation system

Plumbing: Plumbing, sprinkler and shutdown systems.