Project
Financial scope:NIS 14,000,000
Execution period:3 years
Work commissioned:Gev Yam LTD
Mission: Electricity installment in a 28-story office tower 53,000 square meters large and a 4-story parking lot approximately 32,000 square meters large, including a car-switch system, lighting ducts, integrated fire detection and alert systems, Led lighting fixtures, light control systems and nuclear lobbies in every lot floor.
Electricity: Execution of high and low voltage systems, structure control, electrical panels and generator.
גלריה של הפרויקט